Categorization:Product Information
1. Hanging wire: wire harness processing station arrangement according to the characteristics of the wire harness to determine, generally from the beginning of the station for the hanging wire station, on the line first on the line brought by the fuse box, and then on the line brought by the large sheath (multi-hole position sheath), followed by the line brought by the small sheath (less holes), and finally on the line on a separate pumping plate. 2. wrapping station arrangement: according to the daily demand and operation content, by more than one station to complete the bundling. Assembly line process card preparation, assembly line tooling diagram by station decomposition, the initial determination of the station and personnel. The setup of strapping stations follows the principle that personnel do not intervene with each other, and that the front station does not cause inconvenience to the rear station. Decomposition to carry out wrapping station when a separate figure number used by the branch to be cited in the enterprise branch of the student labeling data using the figure number, the branch on the sheath does not have to be in order to reflect, but must be studied to show the sheath next to the labeling of the coordinate number When the fuse box is a separate branch, the last own wrapping fuse box parts, so that the fuse box wires left with sufficient margin to prevent the work terminal through the force after the backing off; when the Fuse box is not as a national independent branch, the middle of the wire can pass through in accordance with the first wrapping branch, then wrapping the trunk, the fuse box next to the wire is also the last wrapping. 3. Preparation of fasteners to install the workplace: the last step of the assembly line Emerald Art card is to determine the working position of the fixed tape and fasteners. It takes only one page to complete. Install the straps according to the drawing and use the strap gun to cut all the leads of the harness. Then convert to the next step. (1) work position allocation essentials: follow the principle of balanced social distribution (which has a certain relationship with the design of the pre-assembled drawings, to achieve easy for students to adjust flexibly, a separate line to become a page), to achieve the beat production. For the line does not wear a sheath and a separate draw plate is arranged to the end of the line is a hanging line workstation hanging line. The new project assembly line operation often need to borrow the existing research project staff resource allocation issues for reasonable arrangements, production process management personnel to the assembly line for each workstation operating activities time information for data recording, the difference is still more obvious workstation can be adjusted immediately, and then the development of the actual operation of the use of time records, and finally to do a workstation balance chart for investigation and analysis. (2) Station balancing method: Record the running time of each station, analyze the workstation balancing chart, adjust the workstation after analysis, and then record the running time of each station. It takes many adjustments to reach balance.-4、About Evergrande Electronic Products Network platform related to the introduction and sales of products briefly: Evergrande Electronic Products Network - a professional agent / production / sales of a variety of {connectors | wiring harness | wire and cable products }; if you have a related [connectors | wiring harness | wire and cable products] purchasing / sourcing needs or would like to buy / to understand what connectors | harness | wire and cable products we can provide solutions, please contact the following Division I business personnel; If you have related [connectors | wire harness | wire and cable products] sales / resources and promotion needs, please click on the "¡¡ Business Cooperation ←" with the person to discuss!